A look at some of the jobs we're proud of across Fredericton and the surrounding area. Drag the sliders to compare before and after.
Replaced aging 40-gal tank with a Navien NPE-240A2 tankless. Upgraded gas line and added dedicated venting.
Camera-scoped main line, located root intrusion 18 ft from cleanout, cleared with high-pressure jetting.
Full plumbing rough-in for new ensuite — shower valve, tub, double vanity, and toilet. Passed inspection first visit.
Replaced 22-year-old furnace with a Lennox EL296V 96% AFUE. Full duct inspection and combustion analysis.
Full home repipe from original 1940s copper with pinhole corrosion to modern PEX-A. 3-day job, minimal drywall.
Midnight call — burst copper elbow in basement. On-site in 38 minutes. Repaired and restored water same visit.
More project photos coming soon. Call us to discuss your project.
Get a free, upfront quote with no obligation. Most calls scheduled same or next day.